Make Online Payments
Lead Service Line Information

Hydrant Flushing April 21st to May 21st 2021

The Keansburg Water Department will commence HYDRANT FLUSHING your water distribution system on April 21st, 2021. Regular flushing is required by the State and is done to improve the aesthetic quality of the water by removing any accumulated non-harmful sediment in the water remains.

This work should be completed by May 21st, 2021. All flushing will be done between the hours of 9:00
p.m. and Midnight to minimize public inconvenience. The quality of water will not be affected, although some temporary discoloration or reduction in pressure may occur briefly in the areas being flushed.

Residents are advised to CHECK THE WATER before washing clothing.

Thank you for your cooperation